HomeInvestmentsTourism Real EstateBidding process to be held for the rehabilitation of streets in the Colonial City

They will hold a bidding process to rehabilitate streets in the Colonial City

THERE WILL BE

This tender represents a comprehensive rehabilitation of approximately 4,700 meters of street sections, at an estimated cost of $24 million. The project is expected to last 30 months, beginning at the end of this year.

SANTO DOMINGO.- The Colonial City will gain ten thousand square meters of sidewalk space with the rehabilitation of the public spaces of its streets that will be carried out within the framework of the Comprehensive Program for Tourist and Urban Development of the Colonial City of Santo Domingo (Pidtuccsd). 

The Ministry of Tourism (Mitur) launched an international public tender for works to be carried out with resources from the Inter-American Development Bank (IDB), which aims to eliminate visual pollution and stimulate the architectural appreciation of the Historic Center, for the enjoyment of its inhabitants and visitors. 

This tender represents a comprehensive recovery of approximately 4,700 meters of street sections, at an estimated cost of 24 million dollars, Mitur reports in a press release.

He says that this intervention is projected to last 30 months, starting at the end of this year.

The rehabilitation works will be carried out simultaneously in two lots; one starts on Las Damas street, in a south-north direction, and a second section includes Las Mercedes, from Hostos street to Palo Hincado, in an east-west direction.

These improvements include burying electricity and communication service networks, and replacing the drinking water, sewage, and stormwater drainage systems. They also encompass the visual and functional transformation of vehicular and pedestrian traffic surfaces, with the renewal of paving materials and street furniture.

It highlights that, with these interventions, the Colonial City will gain 10,000 square meters of sidewalk, eliminate visual pollution, and stimulate the architectural appreciation of the Historic Center, for the enjoyment of its inhabitants and visitors. 

It also promotes the implementation of the Urban Mobility Plan, which implements more sustainable modes of transport, such as walking, cycling and efficient electric public transport, compatible with economic growth, social cohesion and environmental protection.

To participate, interested bidders can obtain information about the bidding process through the Coordination Unit of the Comprehensive Tourism and Urban Development Program of the Colonial City of Santo Domingo at the email address adquisiciones_ucp@mitur.gob.do and by phone at 809-545-1548 extension 7370 and 7372.

About the Comprehensive Tourism and Urban Development Program

The program's main objective is to revitalize the Colonial City of Santo Domingo in its urban, economic, and cultural tourism aspects through the restoration of public spaces and historical monuments; the improvement of living conditions for residents; the development of local economies; and the strengthening of the area's management. This is being implemented with a US$90 million loan from the Inter-American Development Bank (IDB).

Be the first to know about the most exclusive news

Advertisingspot_img
El Inmobiliario
El Inmobiliario
We are the Dominican Republic's leading media group, specializing in the real estate, construction, and tourism sectors. Our team of professionals focuses on providing valuable content, delivered with responsibility, commitment, respect, and a dedication to the truth.
Related Articles
Advertising Banner Coral Golf Resort SIMA 2025
Advertising
Advertising spot_img