In construction, mistakes are costly. But when they aren't detected early, they can cost much more. A poorly installed pipe, an inadequate slope, faulty waterproofing, an electrical installation that's out of specification, or a structural element installed without proper oversight can remain hidden until correcting them involves demolition, reconstruction, and delays to other activities.
That's one of the main functions of technical supervision: to detect the deviation before it becomes rework.
Research allows us to put the economic scale of the problem into perspective. A study published by the American Society of Civil Engineers (ASCE), based on 359 projects from the Construction Industry Institute database, indicates that the direct costs of rework can reach around 5% of the total construction cost.
This means that, in a project of RD$500 million (example), that would potentially be equivalent to RD$25 million. (Source: Hwang, Thomas, Haas and Caldas, Journal of Construction Engineering and Management, ASCE, 2009).
Other studies show greater impacts.
A study of 161 projects identified direct rework costs equivalent to 6.4% of the contract value and indirect costs of 5.9%, associated with loss of productivity, administration, interruptions, and delays. (Source: Love and Edwards, Civil Engineering and Environmental Systems, 2005).
However, there is no universal percentage applicable to all works.
A 2026 academic review estimated that quality failures can represent between 0.03% and 26% of the project value, depending on the definition of failure, rework, or nonconformity and the methodology used, highlighting the difficulty of quantifying the true cost of poor quality. (Source: Construction Management and Economics, 2026).
There is another revealing fact: studying only how much it costs to repair can underestimate the problem.
A study analyzing 19,605 rework events across 346 projects found that these reduced the contractor's annual profit by an average of 28% during the analyzed period. Just 88 events, or 0.45% of the total, accounted for 34% of the recorded costs. (Source: Love et al., Production Planning & Control, 2018-2019).
In other words, a few major failures can significantly impact profitability.
For the Dominican Republic, the issue is especially relevant due to the economic volume of the sector.
The 2025 National Survey of Economic Activity (ENAE) by the National Statistics Office (ONE) reported a gross production value for the construction sector of RD$224,687.37 million in 2024, within the companies included in that survey. (Source: National Statistics Office, ONE, ENAE 2025–Construction Sector).
Furthermore, the Central Bank reported that in July 2026 construction grew 8.1% year-on-year and that credit allocated to the sector increased 18.2%, equivalent to more than RD$28 billion in additional funds.
But the cost of poor supervision doesn't end with the budget.
A facility that needs to be demolished delays the schedule; hidden work without inspection makes it difficult to verify its quality; a late test can turn a small leak into major repairs, and incompatibilities between structure and facilities can affect several specialties.
Supervision is not simply observing the work; it is technically controlling its execution. It involves inspecting, measuring, documenting, testing, recording nonconformities, verifying corrections, and releasing processes before allowing them to be covered by subsequent stages.
Therefore, the cost of effective technical supervision should not be analyzed simply as an additional expense, but in relation to the economic impact that building without it can represent.
In construction, the most costly mistake is not always the one that is made, but the one that is detected too late.